FilmProt
The project has two main objectives, the first is to optimize culture conditions to determine the maximum specific and volumetric yields that can be obtained with the biofilm system and the second is to investigate the robustness of the system by studying its ability to express proteins of different sizes. To this end, the system will Coordinatorultaneously express 3 enzymes comprising a 4-step artificial pathway for the synthesis of a value-added compound.
Project webpage Start year 01/10/2018 End year 31/05/2022 ID LISBOA-01-0145-FEDER-029589 iBB Role Partner iBB Budget 35 000,00 € Research Group BERG PI Gabriel Monteiro Project Partners FEUP- Faculdade de Engenharia da Universidade do Porto (Coord.) Status Completed Funding FEDER/FCT